Jet Engine - Heathrow
Jet engines are routinely serviced and maintained. With each engine costing millions of pounds, it’s important that the engine is back in the air as quickly as possible. The engineers working on the engines have to be both fast and efficient.

Incinerator - Crossness
In 1998 the practice of dumping sewage sludge at sea was banned, in November of that year the incinerator at Crossness was operational burning the sludge. The energy produced by this process is then used to power the whole sewage treatment works.

River Calder - Altham
This project was a combination of several survey disciplines to be able to produce the required results. After severe flooding during winter, a large section of riverbank had been washed away and temporary flood defences installed.

Heron Tower - London
Completed in 2011, the 46 floor Heron Tower stands over 200 metres tall and offers impressive views across the city of London and further afield.

Pumping Station - Honor Oak
A laser scan survey was required at this pumping station to create a 3D model to help inform the engineers who had been tasked with repairing several elements within the chamber.

Rail Depot - Bristol
Trains need to be regularly serviced and are often brought into the depot for maintenance. The depot platforms are cramped and have many steel columns and beams which can make working on the trains difficult using standard mobile platforms.